| BACKGROUND | Qualifications: | 1991-1996 BEng Electrical-Electronics Engineering University of S&B, Iran |
|||||||||||
| Experiences | 1999 - 2000 I&C Design Engineer With : IFG (Iran) | Responsible for the basic and detailed design of the instrumentation & control system of a Sodium Carbonat factory | |||||||||||
| 2000- 2001 I&C Engineer With : GN(Iran) | Responsible for Pre-commissioning and commissioning of 4 units thermal power stations generating 1260 Mw | ||||||||||||
| 2001- 2003 I&C Lead Engineer With : TSA(Iran) | Responsible for Pre-commissioning and commissioning of 5 units simple cycle and 3 units hydro power plants | ||||||||||||
| 2003- 2005 I&C Lead Engineer With : SHOOKA | Responsible for Pre-commissioning and commissioning of 4 units simple cycle power plants generating 660 Mw | ||||||||||||
| 2005- 2006 I&C Lead Engineer With : Alstom Power(Iran) | Responsible for design,installation,commissioning and hand over of 2 units simple cycle power plants generating 330 Mw | ||||||||||||
| 2006- 2007 Commissioning Manager With : Cegelec Oil & Gas(UAE) | Responsible for all activities related to transfering control loops to a new distributed control system | ||||||||||||
| 2007- 2008 Site Manager With : Areva T&D(UAE) | Responsible for planning,execution and hand over of 3x400/132 kV substations | ||||||||||||
| 2008- 2009 Commissioning Manager With : Cegelec Oil & Gas(Indonesia) | Responsible for all activities related to planning, Pre-commissioning and commissioning of TUNU11 gas field | ||||||||||||
| 2009- 2012 I&C Lead enginees/Warranty Manager With : Alstom Power(Ireland) | Responsible for construction, commissioning, hand over and after sale services of 1 unit comined cycle power plant generating 420 Mw | ||||||||||||
| 2012- till date I&C Lead Engineer With : ESBI(Ireland) | Responsible for technical support and fault finding of ESB power plants in Ireland | ||||||||||||
| PROFILE | Academic Year | 2013/2014 | |||||||||||
| Mode | Part Time | ||||||||||||
| Expected Graduation: | November 2014 | ||||||||||||
| EXPECTATION | "I have always intended to be continuing with my further education, I found this course suitable based on my post graduate degree and considering my work experience. I am glad to be accepted by a well-known university as UCC to achieve my targets I have set up by taking this course." |
||||||||||||
| COURSE | Compulsory | CE 6011: Software Engineering(1), CE6027: Energy System in Buildings(1) | |||||||||||
| Electives Modules | CE 6014: Computer Mediated Communication, CE6015: Knowledge Management | ||||||||||||